2114 Corporate Dr · Boynton Beach, FL 33426 Mon–Fri 8am–5pm · Sat 9am–2pm · (561) 200-5555
A stone bench and a stone shelf fitted into a tiled shower

What to Expect on Countertop Installation Day

This guide

Published
Updated
Author
The American Countertops & Design team
Get a Free Estimate
On this page
  1. Before the Crew Arrives
  2. Removing the Old Countertops
  3. Setting and Leveling the Stone
  4. Seams, Sinks and Cutouts
  5. Reconnecting the Sink and Cooktop
  6. Cleanup and Care Instructions

Once your countertops have been cut and polished in our shop, it's time for countertop installation.

Our own installers arrive with your new granite, quartz, quartzite or marble pieces and carefully set them in place.

Homeowners often worry about disruption, but on a countertop installation in Palm Beach County, most kitchens are installed in a single day.

This guide follows installation day in order, from getting the room ready to the last wipe-down, so you know what to plan around. For the whole service, from digital templating to the finished kitchen, see our page on countertop installation in Boynton Beach.

Finished countertops from a recent job by our crew
Who handles what on installation day
TaskWho handles it
Clearing counters and the sink cabinetYou, the day before
Removing old topsOur crew, when it's on your estimate
Setting, leveling and seamingOur crew
Attaching the undermount sinkOur crew
Sink and cooktop hookupsAgreed with us before your estimate is final
Cleaning upOur crew, before they leave

Before the Crew Arrives

You'll have met our crew on template day — the same people who will set your stone come out for digital templating. By then, your space needs to be ready: cabinets installed and anything mounted above or beneath the countertop already in position. If you're curious about what happens to the stone between those two visits, here's how fabrication works.

How long does countertop installation take? As a rule, you can expect installation 7–10 business days after templating. Use that time to prepare for countertop installation. A short countertop installation checklist for the day before:

  1. Take everything off the countertops: small appliances, dish racks, the knife block.
  2. Empty the base cabinets under the counters being replaced, starting with the one under the sink.
  3. Clear a path from your entry to the kitchen, since the stone comes in as large finished pieces.
  4. Plan to keep pets and children out of the work area while the crew is there.
  5. Settle the sink and cooktop hookups with us ahead of time (more on that below).

Removing the Old Countertops

If you're replacing existing tops, the first step is removing your old countertops and preparing the base cabinets.

Our crew can take out the existing countertops and cart them off for disposal as part of your project. When your job needs it, the removal is written into your estimate before the day, so you know in advance exactly what goes out the door with the crew.

Keeping a tile backsplash? Tell us when we prepare your estimate. Tile that sits on the old countertop can come loose when the top comes out, so it's worth planning for.

Setting and Leveling the Stone

Installers then test-fit each section of the new countertop, making small adjustments so that seams are tight and edges align perfectly.

During a granite countertop installation, the crew sets each piece on the cabinets and checks it for level before securing it. Quartz, quartzite and marble installations follow the same process.

The people doing this work are the ones who measured your kitchen on template day, working from their own measurements and the seam plan you saw before the stone was cut. Your project isn't handed off to a subcontractor: cutting happens in our shop, and the setting is done by our own installers.

Seams, Sinks and Cutouts

For large kitchen islands or L-shaped counters, multiple slabs may need to be seamed together, and the seams are bonded with color-matched epoxy for a tight fit.

A standard slab runs about 120 by 55 inches, so on a long counter run or a large island, a seam is common. Its position is settled well before installation day. We plan every seam on your actual slab, use as few as the layout allows, keep them away from the spots your eye lands on first, and review the plan with you before any cutting starts.

They'll also attach undermount sinks. The openings are already there when the stone arrives: sink, cooktop and faucet holes are cut in our shop, not drilled in your kitchen. Still choosing a basin? Our sinks page lays out the styles we work with; pick yours before template day so the opening is cut to match.

Reconnecting the Sink and Cooktop

With the stone set and the undermount sink attached, the sink and cooktop still have to be hooked back up before you can use them.

That's the one part of the day to settle in advance. When we prepare your estimate, ask us about unhooking the sink and cooktop before the old tops come out and hooking them back up afterward, so the plan for both is clear before the crew arrives.

Replacing the faucet too? Choose it before template day, because its holes are cut in our shop along with the sink opening.

To minimize downtime, plan meals that don't require a full kitchen.

Cleanup and Care Instructions

After everything is leveled and secured, installers clean up the area and leave you with care instructions, such as when to seal natural stone or what cleaners to avoid.

This is where the four materials part ways. Quartz, being engineered and non-porous, never needs a sealer, though hot pans still belong on a trivet. Granite takes a penetrating sealer, reapplied every 1–2 years. Quartzite is natural stone as well and needs sealing from time to time, and the care notes you get cover how often for your slab. Marble, softer and more porous than quartz or granite, develops a patina over time.

Investing in professional installation is crucial; DIY mistakes can lead to cracks or uneven seams. By working with experienced installers familiar with quartz, granite and marble countertops, you ensure that your new surfaces look stunning and last for years to come.

Payment follows the same order as the work: your 50% deposit started fabrication, and the rest comes due once installation is finished.

When you're ready to replace those outdated countertops, trust the experts. Visit our showroom at 2114 Corporate Dr, Boynton Beach, FL 33426 to explore materials, or call us today at (561) 200-5555. We'll walk you through the installation process and schedule a date that fits your timeline. Want a price first? You can also schedule your estimate online.

FAQ

Installation Day Questions

Can I use my kitchen the day the countertops are installed?

Plan on the counters and the sink area being a work zone for the day. Most kitchens are installed in a single day, and the undermount sink goes in as part of that work. When the sink and cooktop are usable again depends on when they're hooked back up, which is why it pays to ask about that while we prepare your estimate. Until then, easy no-cook meals or takeout keep dinner simple.

Will installation make a lot of dust?

Less than you might expect, because most of the dusty work happens before the day. Cutting and polishing happen on CNC equipment in our shop, and your sink, cooktop and faucet cutouts are made there too. In your kitchen, the crew removes the old tops if that's on your estimate, then sets, levels and seams the finished stone. Small adjustments can still make some dust, and the crew cleans up before they leave.

Do I need to empty my cabinets before installation?

Empty the base cabinets under the counters being replaced, and the sink cabinet first of all, since that's where the crew works to attach an undermount sink. Clear the countertops too. The cabinets themselves stay put: they need to be installed by template day, because your countertops are measured and cut to fit them. If you're replacing cabinets as well, that work has to be finished before we measure.

Free Estimate

Plan Your Installation With a Free Estimate

Share a few details about your kitchen and we'll price your layout; if the old tops need to come out, that goes on the estimate in writing. It's free, with no obligation.

Don't have measurements yet? Measuring is free, or snap the room on your phone, add rough dimensions and we can start pricing from that.

  • Most kitchens installed in a single day
  • The same crew from template day to installation day
  • Sink and cooktop openings made in our shop
Free Estimate

Get Your Free Countertop Estimate

Three quick steps. We reply with pricing for your slab and your layout.

Step 1 of 3

We text you only if you check the text messaging boxes in step 3. Both are optional and consent is not a condition of any purchase.

Last step — one required box, two optional.

Prefer to talk first? Call (561) 200-5555 or email sales@american-tops.com.

Address
2114 Corporate Dr
Boynton Beach, FL 33426
Get Directions (opens in a new tab)
Hours
Mon–Fri 8am–5pm
Sat 9am–2pm
Sun closed

Our crew installs from Jupiter and Wellington south through Delray Beach and Boca Raton to Pompano Beach, which covers Palm Beach County plus North Broward. Farther north, around Port St. Lucie? A quick call tells you if your address is on our route. See all areas we serve

Call Us